Commercial

JA Greene Construction Builds Medical Office for Texas Surgical Dermatology

Over the past few years, a healthy portion of JA Greene Con­struc­tion Services’ projects have been in the medical field. This year, Texas Surgical Der­ma­tol­ogy, PA chose the Houston-based design/​build general con­trac­tor to oversee the design and con­struc­tion of its newest medical office build in Spring, TX, designed by CDA Archi­tects. ASA Dally Struc­tur­al Engineers and Outlier Engi­neer­ing served as the struc­tur­al engineers, and GWS Services, Inc. was the installing con­trac­tor on the project. 

The building owner, Dr. Tri Nguyen, is board certified in der­ma­tol­ogy and is fel­low­ship trained in Mohs surgery, the gold standard for treating skin cancers. Dr. Nguyen wanted to incor­po­rate feng shui tech­niques into his new building and also build a sus­tain­able office, using as many Texas-based companies and materials as possible. In addition to a more sus­tain­able building, Bautex System’s insulated concrete wall system also creates more com­fort­able, energy-efficient, stronger and safer buildings.

Jonathan Greene, owner of JA Greene, cites Bautex Block as a lower-cost option than concrete tilt walls. He notes that it has a higher insu­la­tion value over tra­di­tion­al concrete, and, says that once trained on the system, it is simple to install.

Texas Surgical Der­ma­tol­ogy, PA plans to move into the new facility in late-August 2016.